Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 28 results ...

Abeytunga, P K (1978) The role of the first line supervisor in construction safety: the potential for training, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Albarkoly, K (2017) Exploring the maintenance practices and strategies in the Libyan cement industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Allenby, V R (1986) Cost models for engineering services, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Alqubaisi, S (2019) Developing a framework to assess the portfolio governance, risk and compliance of Abu Dhabi Government entities in the UAE, Unpublished PhD Thesis, , Aston University.

Bartram, N (1981) Evaluation and development of drainage and pipeline construction processes, Unpublished PhD Thesis, , Aston University.

Berny, J (1988) Forecasting and risk analysis applied to management planning and control, Unpublished PhD Thesis, Aston Business School, Aston University.

Byrd, R H (1981) The mathematical modelling of the environmental performance of buildings as an aid in the design process, Unpublished PhD Thesis, , Aston University.

Callcott, A E (1985) Microcomputers for civil engineering consultancy in developing countries, Unpublished PhD Thesis, , Aston University.

De Garay, A (1982) Evaluation of public housing strategies in Mexico City: an exploratory goal programming approach, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Eke, G (2017) Determining the probability distributions of cost and time overrun arising from different contractor selection strategies in construction projects, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

El Bakry, S M (1981) Measurement of productivity and cost of the direct labour organisation within highways maintenance departments, Unpublished PhD Thesis, , Aston University.

Flanagan, R (1980) Tender price and time prediction for construction work, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Haghdadi, H (1989) The role of micro computers on the construction site, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Izzat, R M (1977) A computerised approach to bidding strategy in civil engineering, Unpublished PhD Thesis, , Aston University.

Jesson, J K (1988) Ethnic minority builders: a comparative study of Britain and the United States of America on affirmative action in the building industry, Unpublished PhD Thesis, Aston Business School, Aston University.

Johnston, J O D (1975) Development of a computerised library system in the construction industry, Unpublished PhD Thesis, , Aston University.

Jones, A M (1990) Design and construction for traditional house building, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

Kim, K (2015) Conceptual building information modelling framework for whole-house refurbishment based on LCC and LCA, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Kotula, M (2013) Development of a risk-oriented strategic sourcing framework for the construction and electronics manufacturing industries, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

McLeish, D C A (1978) House building productivity: A study of labour requirements on Scottish house building sites using activity sampling methods, Unpublished PhD Thesis, , Aston University.

Nayfeh, M (1989) A combination of cyclone and vert techniques for the management of construction projects, Unpublished PhD Thesis, Department of Civil Engineering, Aston University.

  • Type: Thesis
  • Keywords: CYCLONE; network analysis; operations research; planning techniques; production process; prototype development; simulation-based network model; site operation; VERT
  • ISBN/ISSN:
  • URL: http://publications.aston.ac.uk/id/eprint/14280/
  • Abstract:

    Many planning and control tools, especially network analysis, have been developed in the last four decades. The majority of them were created in military organization to solve the problem of planning and controlling research and development projects. The original version of the network model (i.e. CPM/PERT) was transplanted to the construction industry without the consideration of the special nature and environment of construction projects. It suited the purpose of setting up targets and defining objectives, but it failed in satisfying the requirement of detailed planning and control at the site level. Several analytical and heuristic rules-based methods were designed and combined with the structure of CPM to eliminate its deficiencies. None of them provides a complete solution to the problem of resource, time and cost control. VERT was designed to deal with new ventures. It is suitable for project evaluation at the development stage. CYCLONE, on the other hand, is concerned with the design and micro-analysis of the production process. This work introduces an extensive critical review of the available planning techniques and addresses the problem of planning for site operation and control. Based on the outline of the nature of site control, this research developed a simulation-based network model which combines part of the logics of both VERT and CYCLONE. Several new nodes were designed to model the availability and flow of resources, the overhead and operating cost, and special nodes for evaluating time and cost. A large software package is written to handle the input, the simulation process, and the output of the model. This package is designed to be used on any microcomputer using MS-DOS operating system. Data from real life projects were used to demonstrate the capability of the technique. Finally, a set of conclusions are drawn regarding the features and limitations of the proposed model, and recommendations for future work are outlined at the end of this thesis.

Panopoulos, G D (2003) Economic aspects of safety in the Greek construction industry, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Parker, M A (2022) Developing a performance index to measure soft skills on construction projects: a Delphi study, Unpublished PhD Thesis, , Aston University.

Peckitt, S J (2001) Construction industry safety culture: a comparative study of Britain and the Caribbean, Unpublished PhD Thesis, School of Engineering and Applied Science, Aston University.

Prabhu, S P (1980) Effective tendering for large scale overseas turnkey projects, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Sidwell, A C (1982) A critical study of project team organisational forms within the building process, Unpublished PhD Thesis, Department of Construction and Environmental Health, Aston University.

Skinner, D W H (1979) An analysis of the utility of bills of quantities in the process of building contracting, Unpublished PhD Thesis, , Aston University.

Thannon, A Y (1989) The appraisal and management of multistorey dwelling blocks using large concrete panel systems, Unpublished PhD Thesis, , Aston University (United Kingdom).